少妇寂寞偷公乱400章深夜书屋,色综合久久精品亚洲国产,国产精品日韩欧美一区二区三区,国产艳妇av在线观看果冻传媒

網(wǎng)站首頁技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時間:2013-07-29 點擊量:3578

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

张栢芝被柔到高潮下不了床| 亚洲久热无码av中文字幕| 成人性做爰AAA片免费看| 囗交姿势图3d效果展示图| xx性欧美肥妇精品久久久久久| 熟妇高潮精品一区二区三区| 无遮真人祼交视频| 狠狠五月色婷婷蜜桃777| 黄色电影免费观看| freepeople性欧美| 国产草草影院ccyycom| 亚洲欧美国产精品专区久久| 狠狠色噜噜狠狠狠狠色综合久| 成人亚洲精品777777| 被粗汉h玩松了尿进去| 我和虎狼之年的岳135章| 日韩吃奶摸下aa片免费观看| 太紧了夹得我的巴好爽| 我和子发生了性关系视频| 亚洲av中文无码乱人伦在线视色| 又粗又爽高潮午夜免费视频| 荡货 喂奶 h| 男男浴室吸乳play| gogogo免费高清日本| 99re8在这里只有精品2| 国产亚洲精品精品精品| 强壮公次次弄得我好爽a片| 久久人人槡人妻人人玩夜色av| 吸咬奶头狂揉60分钟视频| 一本色道久久爱久久综合网| 国色天香久久久久久久小说| 驯服人妻hd中字日本| 国产v亚洲v天堂无码久久久| 扒开她粉嫩的小缝尿进去h漫画| 人妻被按摩师玩弄到潮喷| 伊人久久大香线蕉综合75| 日本美女视频| 激情国产一区二区三区四区小说| 韩国年轻漂亮岳每4乱理| 99精品国产在热2019| 亚洲欧美成人av在线观看|